well at the moment the new carrier needs to be slightly modified to take the centre mounting from the old carrier just waiting on it being done tnen once it's fitted to the cutting deck I'll have a better idea of the blade size ,all that is left to done is pull out the back end and change the bearings and out it back together,front has been done and is back together ,gearbox is done and back together just the cutting deck holding it up a bit but theres no rush,main thing is the engine runs, though a few petrol leaks from the tank gasket area ,that was a new gasket I put on so it should'nt leak, then will have to sort out the govenor linkage ,but looking at the diagram it looks like there is a part missing off the carby